Disciplines > Configuration & Change Management > Workflow > Manage Baselines & Releases

Topics

Purpose

How to Staff

 

Purpose To top of page

The purpose of this workflow detail is:

  • To ensure that subsystems, when they reach a specified level of maturity, are baselined, and then available for release, or re-use in subsequent project iterations and/or other projects.

Releases frequency and formality are described in the CM Plan. The degree of formality is clearly much higher for a product being released to a customer than that being generated for the next iteration build or review.

How to Staff To top of page

The Configuration Manager in this case needs to be able to assemble a product for release. The released product requires a Bill of Materials (BOM) that serves as a complete checklist of what is to be delivered to the customer. The released product will inevitably require release notes and training material as described in the Deployment Discipline.

The Integrator (as described in other Workflow Details) needs to be sure that artifacts delivered from the developer workspaces are sufficiently tested such that they can be incorporated into a testable build. The Integrator needs to be familiar with Project CM Policies and Test Practices.