ID11 |
Risk Information Sheet Plan |
Identified: _7/12/2011_ |
||||||
Priority Probability Impact |
7 M M |
Statement It has recently been decided that the Infrared sensors will be developed in-house and how they will communicate and how sensor data will be processed will be based on assumptions until the detailed design is baselined; the accuracy and completeness of those assumptions will determine the magnitude of change in the IR-SIP Instrument Controller CI and Infrared Sensing Unit CI interface requirements - it could be minor or catastrophic. |
||||||
Timeframe |
N |
Originator J. Helm |
Class Requirements |
Assigned To: |
||||
Context The AA program is in the Systems Preliminary Design Phase and the IR-SIP project software is in the Software Specification Phase.
|
||||||||
Approach: Research / Accept / Watch / Mitigate Contingency Plan and Trigger |
||||||||
Status |
Status Date |
|||||||
|
|
|||||||
Approval __________________________ |
Closing Date __/__/__ |
Closing Rationale |
||||||
|
|
|
|
|
|
|
|
|