Task |
Description |
Personnel |
Task 1 |
Concept document |
AL, DD |
Task 2 |
Project
Plan |
JG |
Task 3 |
Project
Schedule |
DD |
Task 4 |
Requirements
Analysis |
|
Task 5 |
Requirements
Definition |
|
Task 6 |
System
Specification |
|
Task 7 |
Requirements
Validation |
AL, DD |
Task 8 |
Architectural
Design |
|
Task 9 |
Interface
Design |
|
Task 10 |
Detailed
Design |
|
Task 11 |
Coding |
|
Task 12 |
Unit
Testing |
|
Task 13 |
Integration
Testing |
|
Task 14 |
System
Testing |
|
Task 15 |
Acceptance
Testing |
|
Task 16 |
User
Manual |
|
Task |
Description |
Personnel |
Task 1 |
Individual Component Testing |
DD, JG, |
Task 2 |
Input Processing and Monitoring Testing |
|
Task 3 |
Clock Module Testing |
JG |
Task 4 |
Timer Module Testing |
|
Task 5 |
Auto Cook Preset Module Testing |
DD |
Task 6 |
Auto Defrost Module Testing |
JG |
Task 7 |
Cooking Control Module Testing |
|
Task 8 |
Oven Control Module Testing |
DD |
Task 9 |
Timer Display Module Testing |
JG |
Task 10 |
Power Display Module Testing |
|
Task 11 |
Beeper Module Testing |
JG |
Task 12 |
Command Processing Sub-system Testing |
DD, JG |
Task 13 |
Oven Control Sub-system Testing |
JG, |
Task 14 |
Output Processing Sub-system Testing |
DD, JG |
Task 15 |
Microwave Oven System Testing |
DD, JG, |
Task 16 |
Acceptance Testing |
DD, JG, |
No part of this work should be produced or used without the permission of the authors: Michael Turner and Dr. Sharon A White.